Site Readiness Guidance

Guidance that helps you prepare the site before the system arrives.

Site Readiness Guidance
01

Space required

The dimensions of the system and its units, and the clearance needed around it for doors and service access.

02

Power requirements

What supply should be available, according to the model specification in the manufacturer catalogue.

03

Access and movement

Door and corridor widths, and the route the system takes to its final position.

04

Suitable operating environment

General notes on ventilation, temperature, humidity and cleanliness.

05

What to prepare before arrival

A checklist of points best completed before the delivery date.

This guidance helps the client prepare the site. It does not mean that AI-KON carries out finishing or construction work at the site.