Site Readiness Guidance
Guidance that helps you prepare the site before the system arrives.

01
Space required
The dimensions of the system and its units, and the clearance needed around it for doors and service access.
02
Power requirements
What supply should be available, according to the model specification in the manufacturer catalogue.
03
Access and movement
Door and corridor widths, and the route the system takes to its final position.
04
Suitable operating environment
General notes on ventilation, temperature, humidity and cleanliness.
05
What to prepare before arrival
A checklist of points best completed before the delivery date.
This guidance helps the client prepare the site. It does not mean that AI-KON carries out finishing or construction work at the site.